Skip to main content

Find what your BMS is missing.

Optim Energy reviews how your existing building management system is configured, documented and used. We identify faults, avoidable energy use and practical improvements, then help verify what changed.

Technology-neutral · Defined scope · Nationwide in Ireland

Engineer reviewing an existing building management system in a plant room

Useful without a replacement

The review stands on its own, even when the right answer is to retain and improve the existing system.

Action, not another shelf report

Findings become agreed changes, owners, priorities and a practical sequence for improvement.

Evidence after the change

Available trend and energy data are used to check whether the intended result appeared.

See the system as part of the building

A useful review connects BMS configuration with plant behaviour, energy use, operating hours and the people responsible for action.

System and plant context

Map the available BMS architecture, connected services, interfaces, meters, sensors and control points around how the building is actually used.

Schedules and control logic

Review operating hours, optimum start and stop, setpoints, deadbands, sequencing, weather compensation, overrides and suitable control routines.

Sensors, alarms and trends

Check available sensor behaviour, point naming, alarm usefulness, trend history and whether the system provides evidence an operator can act on.

Energy and operating waste

Investigate out-of-hours operation, simultaneous heating and cooling, persistent overrides, abnormal cycling, baseload and other visible sources of avoidable use.

Documentation and operation

Assess control descriptions, drawings, point lists, maintenance information, access arrangements and how operators currently investigate and resolve issues.

Improvement and verification

Prioritise immediate corrections and longer-term work, then use the available BMS and energy data to check whether agreed changes produced the intended result.

A controlled route from inspection to improvement

The scope reflects the system, access and operating risks. We agree what can be inspected and changed before work begins.

  1. Step 01

    Qualify and scope

    We begin with the building type, BMS make and model, connected services, known problems, available data and the people who operate or maintain the system.

  2. Step 02

    Review the system

    We inspect the agreed BMS evidence and operating context on site and, where appropriate, through available trend and remote-access information.

  3. Step 03

    Optimise what is safe

    With written authority, we can make agreed low-risk adjustments. Original settings and changes are recorded, with specialist or vendor coordination where required.

  4. Step 04

    Report and verify

    You receive a prioritised action plan and a record of findings and changes. One follow-up review normally checks the available trend and energy evidence after four to six weeks.

A report built for decisions and follow-through

You own the agreed review report. It separates what can be corrected now from work that needs planning, investment, vendor access or another competent specialist.

Recommendations remain technology-neutral. If Optim EOS could close a demonstrated capability gap, we explain why. It is not the predetermined outcome of the review.

  • Executive summary for the responsible owner or management team
  • System, access and documentation gaps
  • Faults, control issues and visible sources of energy waste
  • Change log for agreed adjustments completed during the review
  • Immediate corrective actions with ownership and dependencies
  • Prioritised improvement and upgrade recommendations
  • Risks, constraints and items requiring a competent specialist
  • 30-, 90- and 180-day action plan
  • One follow-up verification using available trend and energy data
Responsible by design

Access, authority and safety stay explicit

Access shapes the answer

Engineering access, point lists, control descriptions, drawings, trend history, energy data and maintenance records improve the review. Missing inputs are documented as limitations rather than hidden assumptions.

Changes need approval

Agreed low-risk changes require written authority and a change log. Safety-critical programming, unsupported proprietary work and plant-maintenance responsibility remain outside scope unless separately agreed with the relevant specialists.

Savings are site-specific

Results depend on the system condition, connected plant, occupancy, access and which actions are implemented. Any site-specific estimate states its assumptions and proposed verification method.

Where SEAI BMS Optimisation may apply

SEAI currently describes BMS Optimisation support of up to €2,000 or 50% for a qualifying specialist review and optimisation of an existing BMS. This service may align with that measure where the project, provider and applicant meet SEAI's current requirements.

Eligibility, provider requirements, approval and payment are determined by SEAI. Confirm the current position before relying on grant support or committing expenditure.

Read our guide to BMS grants and optimisation support

BMS review questions, answered

What is a BMS performance review?

A BMS performance review examines how an existing building management system or building energy management system is configured, documented and used. Optim Energy reviews the available architecture, connected services, sensors, meters, schedules, setpoints, overrides, alarms, control sequences, trends and operating practices to identify faults, avoidable energy use and practical improvements.

Does Optim Energy replace our existing BMS?

Not automatically. The review is technology-neutral and useful as a standalone service. Optim Energy may recommend retaining and improving the current system, coordinating work with its incumbent vendor, or adding capability where a demonstrated monitoring or control gap exists. Optim EOS is one possible recommendation, not a predetermined outcome.

Can Optim Energy change BMS settings during the review?

Agreed low-risk changes such as suitable schedule, setpoint or alarm adjustments may be made with written authority and a recorded change log. Original settings are recorded where access permits. Safety-critical programming, unsupported proprietary changes and work outside the agreed operating limits require separate scope and the relevant competent specialist.

What do we receive after the review?

The agreed deliverable normally includes an executive summary, system and documentation gaps, faults and energy-waste findings, a record of changes made, immediate corrective actions, prioritised upgrades, risks and dependencies, and a 30-, 90- and 180-day action plan. One follow-up verification using the available trend and energy data is normally included.

What information is needed before a BMS review?

Useful inputs include the BMS make and model, login and engineering access, point lists, control descriptions, drawings, trend history, utility or meter data, operating hours, maintenance records and known issues. Missing information does not always prevent a review, but it can limit the conclusions or require vendor coordination or separately scoped data-enablement work.

Can an Optim Energy BMS review receive an SEAI grant?

The service may align with SEAI's BMS Optimisation measure where the project, provider and applicant meet SEAI's current requirements. SEAI currently describes support of up to €2,000 or 50% for a qualifying review and optimisation of an existing BMS. Eligibility, provider requirements, approval and payment are determined by SEAI and should be confirmed before relying on grant support.

How much does a BMS performance review cost?

Optim Energy scopes each review according to the system size, connected services, available data, site access, vendor involvement and required follow-up. After a qualification call and review of the available system information, Optim Energy provides a defined scope and proposal.

Discuss Your Existing BMS

Tell us the building type, approximate floor area, BMS make and model, connected systems, known issues and whether SEAI support is being considered. We will use that information to define the next useful step.

Discuss Your Existing BMS